Technician with a tablet in front of an open low-voltage switchgear assembly.

LOKI in engineering

AI for engineering. Drawings and experience stay in the building.

“The manufacturer is discontinuing the DS-20 pressure sensor. Which of our devices use it?”

An order passes through many hands. What it produces lives in documents, emails, minutes and databases. LOKI reads it all and answers. With sources.

In engineering

Ask like you’d ask a colleague. LOKI knows the documents.

LOKI runs fully locally on your hardware. It searches specifications, drawings, test reports and mailboxes with a single question. Every answer names its source.

Tuesday, 9:30 a.m.

A supplier discontinues a pressure sensor. Engineering needs to know everywhere it is installed.

The manufacturer is discontinuing the DS-20 pressure sensor. Which of our devices use it?

Four product series, according to the bills of materials 1. For two of them, a replacement type is already approved, the change request from June lists the test results 2. A framework agreement requires written notice to the customer for every component change. The clause is highlighted 3.

  • 1Bills of materials · ERP
  • 2Change request June
  • 3Framework agreement

The list of affected devices is ready before the first customer inquiry arrives.

Project management

Summarize yesterday's project meeting for me.

The meeting produced three decisions: the Q3 budget was approved with 40,000 euros for plant maintenance 1. The delivery date for project North moves to week 38 because supplier parts arrive later 1. And the pilot start with plant 2 is confirmed. Kickoff in two weeks, owned by Ms Berg 2.

  • 1Transcript · 42 min
  • 2Minutes

Inspection

Monday’s the periodic inspection at Meier. Which plan revision applies there?

The valid one is the terminal diagram from the 2023 extension 1. The last test report dates from 14 September 2021, tested by M. Kranz with a Gossen Metrawatt Profitest MXTRA 2. In between, the RCD was retrofitted, commissioned by email on 8 May 2023 3.

  • 1Terminal diagram · EPLAN
  • 2Test report 2021
  • 3Email thread

Along the order

From the specification. To service.

An order passes through many hands. LOKI knows the status at every station.

A hand holding a tablet showing a long document.

01Specification

The specification arrives with the order. A hundred pages or more, and somewhere in it is the requirement that departs from your own standard.

Which protection rating does Meier’s specification require, and does it differ from our standard?

In section 3.4, the specification requires protection rating IP65 for all control cabinets in the field 1. Your design guideline specifies IP54 2. On the 2023 project, the same deviation was resolved with a special release. The engineering email names the extra effort 3.

  • 1Meier specification · Rev. B
  • 2Design guideline
  • 3Email thread 2023

Deviations stand out before design work begins.

Milling head above a workpiece, chips flying.

02Design and variants

A similar part has gone through production before. What took longer than planned back then is in the post-calculation and the meeting minutes.

Have we made a part like this before? And what went wrong back then?

Yes, in 2024 with a similar geometry 1. The post-costing shows the setup time ran twice as long as planned 2. The meeting minutes state the reason: the fixture had to be modified twice 3.

  • 12024 order file
  • 2Post-costing
  • 3Meeting minutes

Planning starts with the experience of the last order. What went wrong once is known the next time.

Wired control cabinet with labeled terminal blocks.

03Changes and change orders

Requirements change during a project. Who requested and agreed to what, and when, is spread across emails, minutes and measurement records.

Which revision applies to control cabinet +S12, and what has changed since release?

Revision D from 4 June applies 1. Two changes have come in since release: an additional motor feeder at the customer’s request, requested by email on 27 May 2, and a larger main switch following the new load calculation 3.

  • 1Change log
  • 2Customer email thread
  • 3Load calculation

Changes are documented in minutes. Change orders are easy to justify, discussions get shorter.

Coordinate measuring machine in the measuring room with a clamped workpiece.

04Testing and records

Delivery comes with documentation. Certificates, cutting lists and delivery notes sit in different places.

The customer wants the 3.1 certificate for batch 84120. Where is it, and where did the rest of the bar go?

The EN 10204 inspection certificate is filed with the goods receipt from 12 May 1. The batch went into three orders, the cutting list shows dimensions and remaining length 2. The delivery note for the customer order lists position and quantity 3.

  • 13.1 material certificate
  • 2Cutting list
  • 3Delivery note

Tracing a batch starts with a question, not a search.

A technician in work clothes operating a control panel.

05Commissioning

The plant is on site at the customer, and the deadline is close. A fault appears that has happened before.

During commissioning, the inverter on the conveyor shuts down on overtemperature. Have we seen this before?

Yes, in 2023 on an identical plant 1. The cause was an incorrectly set motor parameter, the commissioning report gives the correct value 2. The inverter manual describes the setting in section 7.3 3.

  • 1Service report 2023
  • 2Commissioning report
  • 3Inverter manual

The fix from back then is found in minutes.

Technician with a tablet in front of an open control cabinet in a substation.

06Service and experience

A fault on a plant from 2014. The colleague who built it retired a year ago.

Why does the 2014 plant have a different busbar cross-section than the drawing shows?

There is a special release from the construction phase 1. The designer at the time justified the deviation by email 2. The as-built drawing shows the actual build, it never made it into the ERP 3.

  • 1Special release 2014
  • 2Engineering email
  • 3As-built drawing

Experience that has left the building stays retrievable.

Examples. Customers, names, data and details are fictitious.

Cited Answers

Every answer. With proof.

LOKI numbers its sources. One click opens the original on the right page and highlights the passage. Down to the paragraph.

Which protection rating does Meier’s specification require, and does it differ from our standard?

In section 3.4, the specification requires protection rating IP65 for all control cabinets in the field 1. Your design guideline specifies IP54 2. On the 2023 project, the same deviation was resolved with a special release. The engineering email names the extra effort 3.

  • 1Meier specification · Rev. B
  • 2Design guideline
  • 3Email thread 2023

1Specification_Meier_RevB.pdfPage 17 of 140

3 Electrical equipment

3.2 Network type and voltage

The plant is supplied from the client’s network at 400 V, 50 Hz. The network type is TN-S.

3.3 Switchgear

Switchgear shall be planned and built to the state of the art. Spare capacity of at least 20 percent per panel shall be provided.

All outgoing feeders shall be clearly labeled. Labeling follows the client’s plant designation system.

3.4 Protection rating

All control cabinets in the field area shall be built to at least protection rating IP65. Deviations require written approval by the client.

Control cabinets in air-conditioned operating rooms may be built to IP54.

3.5 Documentation

Schematics, bills of materials and test reports shall be handed over in German and English with the delivery.

3.6 Acceptance

Factory acceptance takes place in the presence of the client. The date shall be announced two weeks in advance.

Example. Customer, specification and details are fictitious.

Governance

Every department. Its own rights.

Roles and groups control who can see what. If someone isn’t allowed to see it, search won’t find it for them.

Sales and engineering groups with users, managers and approved tools.
Log of access to external models: time, user, model and tokens per request.
Overview in a plant engineering company’s dashboard: 12,480 documents, 92 users, 7 groups, plus chats and requests from the last 30 days.

Example. Company, names and figures are fictitious.

Rights all the way to the index.

Access limits apply in the interface and all the way into search. SharePoint permissions carry over during sync.

What goes out gets checked.

Before data goes to a cloud model or web search, HEIMDALL checks it. You decide right in the chat. More about HEIMDALL

Sign in as usual.

With Microsoft Entra ID, with two-step sign-in if you like. New users land in the right group automatically.

The Promise

Runs in-house. Without the cloud.

Drawings, specifications and test reports belong in-house. LOKI comes to you on its own hardware. Everything is on board, from the language model to text recognition. Without any internet connection, if you like.

The included LOKI server

No internet?No problem.

Zero

data in the cloud. Out of the box.

Unlimited

users. With one license.

Under 4 weeks

to production. Plug and play.

Want more? Then you enable cloud models, and HEIMDALL checks every request before it leaves the building. More about HEIMDALL

Platform

Four tools. One system.

This page shows LOKI. Three more tools pick up where LOKI alone does not reach: at the machine, on the way to the cloud and in the meeting room. Each runs on its own, and together they form one system.

AI knowledge assistant

Questions for drawings, setup sheets and 8D reports.

LOKI searches what design, production planning and quality have written down, and answers with the exact passage. On your own hardware.

BenefitSetup know-how stays in the plant, even when the setter leaves.

More about LOKI

Machine AI · Design partner program

Readings that never end up in a file.

MINERVA captures currents, temperatures and switching cycles at the equipment, with its own boards on your own network. LOKI then cites the series like a document.

BenefitMaintenance by condition, not by calendar.

More about MINERVA

AI firewall

Cloud AI for translations. Without customers or drawing numbers.

When you pick a cloud model in LOKI, HEIMDALL checks every request before it goes out. Whatever it detects, the cloud only sees as a placeholder. Or you handle the request locally.

BenefitCustomer names and drawing numbers only go out as placeholders.

More about HEIMDALL

AI minute-taker

SAGA takes the minutes of the project meeting.

SAGA records the meeting in house and drafts the minutes. You capture decisions in one click, and the minutes carry the source in the margin.

BenefitIf the change order is disputed, the minutes show what was discussed.

More about SAGA

Examples with invented names and values.

Start with one and add the others when you need them.

LOKI in sales

And in sales?

Sales works with the same LOKI. It asks about costing, change orders and delivery dates.

LOKI in engineering

One station. One conversation.

An intro call shows where along the order LOKI makes the biggest difference for you, and which documents you already have for it.

LOKI can make mistakes. Please verify important information against the cited sources.